Start by placing sand or fly ash into the ball mill for grinding. Once the mixture has reached desired levels of concentration, it is transferred into the slurry storage tank. Use a wheel loader to move lump lime from the raw material heap to the jaw crusher. After pulverization is complete, transfer the processed content to the lime storage facility via a bucket elevator. Use a conveyor to feed pulverized lime into the ball grinder for further refinement. This process can manufacture products according to precise specifications. The powdered lime can now be transferred to storage via the bucket elevator. A bulk cement truck is utilized to pump cement into storage. The procedure for raw material preparation and transport is regulated with optimized dust-removal equipment to effectively prevent pollution.